Level Crossing Supply Solution

Working closely with Northern Ireland Railways RIVVAL were awarded a comprehensive supply package for the delivery of all materials associated with Mc Conaghy’s Level Crossing.

About the project

The brief was to provide a supply solution that eliminated the need for site storage, reduced site operations and maintained possession times to a minimum. RIVVAL providing the following solution:- • REB mechanically assembled at RIVVAL premises; • REB fully wired and tested at RIVVAL premises; • Location cases mechanically assembled at RIVVAL premises; • Location cases fully wired and tested at RIVVAL premises; • Supply of cabling requirements; • Supply of Barrier pedestals and booms; • Supply of track treadles and associated equipment; • Supply of LED wig wag units; • Supply of all electrical and mechanical accessories. As part of the package all material were kitted and packaged to aid site installation. All materials were delivered to site utilising suitable vehicles for the off-loading directly onto site foundations.